
Round / Square Hydraulic Welded Ttube Mill 100m/Min , Roll Forming Machine
Quick Detail:
1. Type: welded steel pipe production line
2. Model Number:VZH-20
Description:
Tube mill are designed to produce round tubes with Diameter 7mm~273mm and
shaped tube(square & rectangular), the tube mainly applied in
manufacturing middle-pressure fluid tubes, boiler tubes, gas pipes,
galvanize pipes, transformer tubes, mechanical parts, frame tubes,
fitness equipment pipes, furniture tubes, decoration tubes, etc..
Basic configuration:
Double-heads uncoiler→Shearing machine & Butt welding
machine→Vertical cage→Forming machine→High frequency induction
welder→De-burr frame(Outside) →Seam grind unit→Cooling
trough→Sizing mill→Turkey head & Straightening→CNC flying
saw→Run-out table.
Applications:
Specifications:
NO | Name | Technical Parameters | Unit |
1 | Tube OD | 10--30 | mm |
2 | Tube Wall Thickness | 0.4-1.5 | mm |
3 | speed | 30-100 | M/min |
4 | Main Power | 45 | kw |
5 | HF welded | 100 | kw |
Competitive Advantage:
Installation, commissioning, training, after-sales service
1,Installation and acceptance
1.1 After the machinery from the supply side to the demand side,
the demand side is responsible for unloading facility.
1.2 Supplier is responsible for the mechanical commissioning.
1.3Demand side should accept the machine after bending specimens
according to demand’s request (subject to the requirements of the
contract)
2,Training
Train to all the adjustment workers, operators, maintenance workers
(hydraulic, pneumatic lubrication system maintenance personnel,
electrical, electronic and control systems personnel, CNC
programmers, technical staff),to make sure they can operate,
adjust, repair, programming properly.
3,Service.
3.1 Quality "three guarantees" period: 12 months form the
commissioning date of acceptance by the demand side
3.2 During the "three guarantees" period of equipment failure, the
supplier is responsible for free repair, replacement parts (except
for the demand side in violation of the rules of accidental damage
caused).
3.3 Responding to the supplier to provide services required by the
buyer receives telephone (fax) the day after, within 48 hours
(except holidays) sent to the demand-side scene.