
Galvanized Sheet Metal Forming Machine , Garage Roller Shutter Door Forming Machine
Main features
Roller shutter door roll forming machine is designed to produce roller shutter door. With shutter door base-plate roll forming machine and shutter door guide-rail roll forming machine compose Shutter door system, which is common and wide usage.Our company all products can be customized according to the customer's requirements.
Working flow
Uncoiler—Guiding—Roll Forming—Punching&Cutting—Output table
Technical parameters
No. | Item | Specification |
1 | Can Formed Material | GI,AI |
2 | Equipment operation | Automatic |
3 | Voltage | 380V 60Hz 3Phase or as your requirement |
4 | Thickness of sheet (mm) | 0.8-1.2mm |
5 | Material width(mm) | As your requirement |
6 | Cover Width of the sheet after formed | as your drawing |
7 | The size of the roll forming machine | 6000mmx800mmx1400mm |
8 | Speed | 8-15m/min |
9 | Diameter of shaft | 40mm |
Machine components
No. | Name | Qty |
1 | Manual Uncoiler | 1 |
2 | Punching Machine | 1 |
3 | Main Roll Forming Machine | 1 |
4 | Cutting Device | 1 |
5 | PLC Control Box | 1 |
6 | Output Table | 1 |
Machine picture
Profile drawing
Advanced machinery, well trained workers.
More than 20 years experience in roll forming machine industry.
Unique designed, good Germany quality, competitive China price.
Full process of roll forming machine solution.
Shipment arrangement available.
After-sales services for overseas installation and commissioning
1. Does one machine can only produce one size?
Not exactly, it depends on which profile the customer want to produce.
2.Do you have after-sales technical support?
Yes,we are happy to give advice and also have skilled technicians
available to maintain the machine overseas to customers’ workshop if needed.
3. You are trading company or factory?
We are Manufacturer, and we export our machine by ourselves.
4.How long the machine could be made?
Normally speaking, high precision roll forming machine could be
made out with 40 working days.If you need machines in hurry, we can
make it for you less than a month.
5. Do you provide customized?
Sure, we can design the machine according to the requirement and profile drawing you provide. Our engineers can offer the best professional solution to our
worldwide clients.
6. May we visit your factory?
Sure,Warmly welcome to our factory at any time.
7.How to visit your factory?
By high speed train from Shanghai to East Wuxi (Wuxi Dong station), half an hour.
8.What's the warranty period?
12 months warranty period, starting from the date of the successful
installation and commissioning of the equipments at the Buyer’s
Installation site.
9.Can we arrange shipment?
Yes, sure, we can arrange shipment for our customers and provide door-to-door service.
Best Regards
Andy Yang
Director
Mobile/Wechat/Skype:0086 139 2126 2246
Jiangyin Dingbo Technology CO., Ltd.
Company introduction
We are located in Jiangyin city, Jiangsu province, specializes in manufacturing various types of high speed, high precision roll forming machines, with more than 20 years’ experience. It has gained highly praise by customers from all over the world, due to top quality and competitive price of the products. Company principle: top quality, low price.
We a professional manufacturer of cold forming equipment (especially high difficulty cold formed steel), wins the trust of customers by its honesty, pragmatic operation philosophy, advanced technology, innovative design thinking, excellent quality, superior after sales service, competitive price, etc.
Main products
We mainly produce all kinds of roof/ wall tile roll forming machine, C purlin, Z purlin, C&Z interchangeable purlin roll forming machine, uni channel forming machine, rack shelf roll forming machine, guardrail roll forming machine, cable tray roll forming machine, metal deck roll forming machine, down pipe roll forming machine, rolling shutter door roll forming machine, auto stacker, EPS/PU sandwich panel production line, slitting line, cut to length line, tube mill, etc, mainly in construction use.
After sale service
1). Engineer will give free training lessons to labors in buyer’s factory.
2). The Buyer will buy the round-trip air ticket for Engineer if visa application is approved. The buyer is also responsible to bear expenses generated, e.g. visa formalities, meals, accommodation and allowance of USD100 for engineer per day.
3). During this guarantee period, we will provide spare parts without any charge in case of quality discrepancy caused by us. If the malfunctions are caused by your incorrect operations, we will provide the buyer spare parts at cost price.
4). We will charge the buyer cost price of spare parts beyond one year and provide long-term technical guide.
Photo of the Factory
Our clients